/ MAD _ roots
A single GroveHaus unit at dusk in a California hillside garden, two people sitting on the patio under string lights

Panelised home · Los Angeles · 2025

GroveHaus

← Selected work

A fully panelised one-bed, one-bath modular home that four people can stand up in a day with hand tools.

Precision-fabricated bamboo-plywood panels lock together on site, so the shell goes up without a crane or any heavy machinery. Two to four installers can erect it in under 24 hours with a cordless drill, a level and basic hand tools.

Client
LIM Living
Program
1 bed · 1 bath
Build time
Under 24 hrs
Crew
2–4 installers
Structure
Bamboo plywood
Embodied carbon
−30% vs timber
Role
Architectural design engineer
GroveHaus unit plan: bathroom and kitchen along one side, a bed alcove and a living area with a sofa
Unit plan
Discuss a project like this
The entry side of a GroveHaus unit at dusk: vertical timber cladding, a louvred service bay, string lights over a raised deck where two people sit talking
Entry deck at dusk

Materials

Bamboo plywood and low-VOC finishes do the structural and cladding work, and a cradle-to-grave life-cycle analysis drove the material choices. Embodied carbon lands about 30 percent below conventional timber construction.

Fabrication

Digital parametric nesting cuts off-cuts and waste by roughly 15 percent, and every panel meets ICC-ES structural, durability and WUI fire-safety standards.

Interior of a GroveHaus unit: panelised walls and ceiling, a kitchen run along one side, a living area with a sofa, and a wall-mounted desk at the far end. The figure plays a walkthrough of the same room as built, unfurnished.
Interior, single module

Documentation

Construction document / assembly model

We keep the panel joints, the wet-core rough-in and the steel connections in one set, and the same geometry drives the interactive model, so what installers read on paper is what they orbit on screen.

ICC-ES seismic test rig
Construction document: fire sprinkler and PEX plumbing rough-in, one long run above two connection details, with part callouts
Fire sprinkler and PEX rough-in

Interactive · SMEPF assembly

7.3 MB · runs in your browser

Structure and MEPF systems Enclosure: ghost it to see through

Mixed, stacked, massed

The core module links or stacks with additional units (studios, kitchens, extra bedrooms), and a steel structure lets it grow vertically into multi-unit configurations.

Three-storey stack of GroveHaus modules on a street corner at dusk, people walking past on the pavement
Three-storey stack
Students sitting and talking in a shared courtyard between clustered GroveHaus units
Clustered units, shared courtyard

My role

In a team of architects, engineers, procurement and production managers, my role was to work with them on the panels, developing the joinery and the composition in Rhino and Grasshopper. We ran the life-cycle analysis, and I produced the construction documents.

  • Rhino / Grasshopper
  • Life-cycle analysis
  • Construction documents

Working on something similar? Start a conversation